Image by rony michaud from Pixabay |
Infrastructure water problems in older communities across the nation are a concern that both the Federal government and State governments are stepping-up to the plate to begin funding of major water projects in the United States.
- Arkansas Natural Resources Commission (ANRC)
- Bipartisan Infrastructure Law water funding
- Water Infrastructure and Innovation Act (WIFIA)
Hiring an in-house engineer is costly based on the professional salary and hiring availability.
An engineering firm with their own project managers that handle multiple areas is the normal means of getting needed work done.
Either way, these are the professionals that understand the work, have the expertise to look for the funding and the knowledge needed for filling out the paperwork for projects needed.
The HISID board of directors (BOC) announced in December 2022, during final budget planning, that HISID did not receive the grant they had submitted for $1.4 Million.
The bid opening was short. There were NO bids to open.
There was NO district manager present either.
A detailed advertisement was placed one time in both the Arkansas Democrat Gazette (March 12, 2023) and the Carroll County News (March 14, 2023).
The last contract on file for ESI Jeff Dehnhardt, P.E. was in 2017.
The contract pricing six-years-ago had the rate for a small project like PRVs at $2000 to prepare and $500 to be present for the bid opening.
Mayor Dan Kees was also present. He was on the HISID BOC in 2017. The last year that a proper contract was written with former District Manager Lawrence Blood and ESI.